<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD Journal Publishing DTD v2.3 20070202//EN" "journalpublishing.dtd">
<article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" article-type="research-article">
  <front>
    <journal-meta>
      <journal-id journal-id-type="nlm-ta">REA Press</journal-id>
      <journal-id journal-id-type="publisher-id">Null</journal-id>
      <journal-title>REA Press</journal-title><issn pub-type="ppub">3042-0202</issn><issn pub-type="epub">3042-0202</issn><publisher>
      	<publisher-name>REA Press</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">https://doi.org/10.48314/ijrceai.v1i1.29</article-id>
      <article-categories>
        <subj-group subj-group-type="heading">
          <subject>Research Article</subject>
        </subj-group>
        <subj-group><subject>Cost, Time, Project management, Consulting engineers, Bridge construction</subject></subj-group>
      </article-categories>
      <title-group>
        <article-title>Examining the Performance and Responsibility of Consulting Engineers in Advancing Construction Projects in Terms of Costs and Time Management (Intra-Urban Bridges in Mazandaran Province)</article-title><subtitle>Examining the Performance and Responsibility of Consulting Engineers in Advancing Construction Projects in Terms of Costs and Time Management (Intra-Urban Bridges in Mazandaran Province)</subtitle></title-group>
      <contrib-group><contrib contrib-type="author">
	<name name-style="western">
	<surname>Gorji Bandpey</surname>
		<given-names>Ghasem</given-names>
	</name>
	<aff>Department of Civil Engineering, Babol Noshirvani University of Technology, Babol, Iran.</aff>
	</contrib><contrib contrib-type="author">
	<name name-style="western">
	<surname>Goleij</surname>
		<given-names>Amirhossein</given-names>
	</name>
	<aff>Department of Civil Engineering, Ayatollah Amoli Branch, Islamic Azad University, Amol, Iran.</aff>
	</contrib></contrib-group>		
      <pub-date pub-type="ppub">
        <month>08</month>
        <year>2024</year>
      </pub-date>
      <pub-date pub-type="epub">
        <day>27</day>
        <month>08</month>
        <year>2024</year>
      </pub-date>
      <volume>1</volume>
      <issue>1</issue>
      <permissions>
        <copyright-statement>© 2024 REA Press</copyright-statement>
        <copyright-year>2024</copyright-year>
        <license license-type="open-access" xlink:href="http://creativecommons.org/licenses/by/2.5/"><p>This is an open-access article distributed under the terms of the Creative Commons Attribution License, which permits unrestricted use, distribution, and reproduction in any medium, provided the original work is properly cited.</p></license>
      </permissions>
      <related-article related-article-type="companion" vol="2" page="e235" id="RA1" ext-link-type="pmc">
			<article-title>Examining the Performance and Responsibility of Consulting Engineers in Advancing Construction Projects in Terms of Costs and Time Management (Intra-Urban Bridges in Mazandaran Province)</article-title>
      </related-article>
	  <abstract abstract-type="toc">
		<p>
			This research evaluated the performance and accountability of consulting engineers in optimizing cost and time management in intra-urban bridge construction projects in Mazandaran province. Classified as applied research with a descriptive survey methodology, the study focused on experts in construction projects due to their specialized knowledge. Key factors influencing project performance included material and labor procurement, on-site resource availability, workforce skill and productivity, stakeholder financial status, consultant and subcontractor expertise, economic and environmental conditions, contractor technology, site and design quality, management practices, and decision-making efficiency. The analysis revealed that factors such as resource availability, workforce productivity, subcontractor expertise, site conditions, and contractor management positively impacted cost and time efficiency. In contrast, delays in decision-making, rework, poor coordination, and environmental challenges were identified as constraints. The findings highlight the importance of addressing these factors to improve project outcomes.
		</p>
		</abstract>
    </article-meta>
  </front>
  <body></body>
  <back>
    <ack>
      <p>Null</p>
    </ack>
  </back>
</article>