Success Factor Prioritisation for Industrial Construction Projects in Iran: A Fuzzy DEMATEL-ANP Analysis of MAPNA Company

Authors

https://doi.org/10.48314/ijrceai.v2i2.46

Abstract

Success in industrial construction project plays an important role in gaining the competitive advantage of the large-scale infrastructure enterprises. The present research proposes a hybrid fuzzy Multi-Criteria Decision-Making (MCDM) methodology to enhance the success in MAPNA Company, which is one of the largest contractors in the Middle Eastern oil industry. The new hybrid fuzzy MCDM framework is presented through the combination of fuzzy DEMATEL and fuzzy ANP methods and also extended to take into consideration the composite materials like Fiber-Reinforced Polymer (FRP), carbon fiber, and glass fiber. In accordance with the literature review, expert opinion, and Delphi technique from 10 experts, seven main criteria and 45 sub-criteria have been determined. Through the fuzzy DEMATEL method, the analysis of cause-effect relationship between the criteria has been conducted, and the results show that project management has the highest level of impact (D = 5.591), while project-related parameters are the most sensitive (R = 5.652). The threshold value of 0.737 has been considered to form  Network Relation Map (NRM). Then, the fuzzy ANP method has been performed to prioritize the criteria. It was found that contractor related factors (normalized weight = 0.177) are the most important amongst main criteria, then project manager related factors (0.175), and finally project management (0.151). As far as the sub-criteria level is concerned, "construction regulations" (S8) has been awarded highest priority (weight = 0.0493) overall, while "customer influence" (S41 = 0.0378) and "certification of products and services" (S9 = 0.0368) were other highly prioritized criteria at this stage. In addition, composite-specific sub-criteria including material certification, specialized fabrication technology, supply chain assurance, and sustainability have also been incorporated in the extended model. FDANP framework offered as an innovative approach is quite reliable as a decision support system in dealing with complexities associated with uncertainties and interrelations in the context of industrial construction projects, especially those using composite materials.

Keywords:

Industrial construction projects, Composite materials, Project success, Fuzzy ANP, Fuzzy DEMATEL, FDANP, MAPNA Company

References

  1. [1] Farkas, E. B. (2018). Review of the guide to the project management body of knowledge (PMBOK Guide). Podium, 34, 85–88. https://doi.org/10.31095/podium.2018.34.6

  2. [2] Demirkesen, S., & Ozorhon, B. (2017). Impact of integration management on construction project management performance. International journal of project management, 35(8), 1639–1654. https://doi.org/10.1016/j.ijproman.2017.09.008

  3. [3] Mattar, C., Arairo, W., Khatib, M., & Azar, A. (2026). Integrating sustainable material performance and project success factors: Insights from the lebanese construction sector. Frontiers in built environment, 11. https://doi.org/10.3389/fbuil.2025.1734576

  4. [4] Gunduz, M., & Almuajebh, M. (2020). Critical success factors for sustainable construction project management. Sustainability, 12(5), 1–17. https://doi.org/10.3390/su12051990

  5. [5] Keleş, A. E., Gülek, G. G., & Górecki, J. (2025). Use of project management knowledge areas in civil infrastructure projects: Implications for sustainability assessment and risk analysis. Sustainability, 17(20), 1–22. https://doi.org/10.3390/su17209129

  6. [6] Chai, Q., Li, H., Tian, W., & Zhang, Y. (2022). Critical success factors for safety program implementation of regeneration of abandoned industrial building projects in China: A fuzzy DEMATEL approach. Sustainability, 14(3), 1–23. https://doi.org/10.3390/su14031550

  7. [7] Naji, K. K., Gunduz, M., & Adalbi, M. (2023). Analysis of critical project success factors—Sustainable management of the fast-track construction industry. Buildings, 13(11), 1–17. https://doi.org/10.3390/buildings13112890

  8. [8] Gudienė, N., Banaitis, A., Podvezko, V., & Banaitienė, N. (2014). Identification and evaluation of the critical success factors for construction projects in Lithuania: AHP approach. Journal of civil engineering and management, 20(3), 350–359. https://doi.org/10.3846/13923730.2014.914082

  9. [9] Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D. (2015). Project success analysis framework: A knowledge-based approach in project management. International journal of project management, 33(4), 772–783. https://doi.org/10.1016/j.ijproman.2014.10.009

  10. [10] Saaty, T. L., & Vargas, L. G. (2006). Decision making with the analytic network process. Springer. https://doi.org/10.1007/0-387-33987-6

  11. [11] Esmaeili, B., Pellicer, E., & Molenaar, K. (2016). Critical success factors for construction projects. In Project management and engineering research (pp. 3–14). Springer, Cham. https://doi.org/10.1007/978-3-319-26459-2_1

  12. [12] Kerzner, H. (2009). Project management: A systems approach to planning, scheduling, and controlling. Wiley. https://books.google.com/books/about/Project_Management.html?id=Ka9K-61xXssC

  13. [13] Kiani Mavi, R., & Standing, C. (2018). Critical success factors of sustainable project management in construction: A fuzzy DEMATEL-ANP approach. Journal of cleaner production, 194, 751–765. https://doi.org/10.1016/j.jclepro.2018.05.120

  14. [14] Hatefi, S. M., & Tamošaitienė, J. (2019). An integrated fuzzy DEMATEL-fuzzy ANP model for evaluating construction projects by considering interrelationships among risk factors. Journal of civil engineering and management, 25(2), 114–131. https://doi.org/10.3846/jcem.2019.8280

  15. [15] Maghsoodi, A. I., & Khalilzadeh, M. (2018). Identification and evaluation of construction projects’ critical success factors employing fuzzy-TOPSIS approach. KSCE journal of civil engineering, 22(5), 1593–1605. https://doi.org/10.1007/s12205-017-1970-2

  16. [16] Cheng, Y. M. (2014). An exploration into cost-influencing factors on construction projects. International journal of project management, 32(5), 850–860. https://doi.org/10.1016/j.ijproman.2013.10.003

  17. [17] Khalilzadeh, M., Banihashemi, S. A., & Božanić, D. (2024). A step-by-step hybrid approach based on multi-criteria decision-making methods and a bi-objective optimization model to project risk management. Decision making: Applications in management and engineering, 7(1), 442–472. https://doi.org/10.31181/dmame712024884

  18. [18] Fallahpour, A., Wong, K. Y., Rajoo, S., Olugu, E. U., Nilashi, M., & Turskis, Z. (2020). A fuzzy decision support system for sustainable construction project selection: An integrated FPP-FIS model. Journal of civil engineering and management, 26(3), 247–258. https://doi.org/10.3846/jcem.2020.12183

  19. [19] El Khatib, A. T. (2022). Critical success factors for implementing off-site modular construction projects in uae: A fuzzy dematel approach [thesis].

  20. [20] Huang, J., Abadi, M., & Yeow, J. (2025). Policy framework for facilitating reverse logistics in circular construction: An integrated Fuzzy-DEMATEL and system dynamics approach. Waste management, 204, 114963. https://doi.org/10.1016/j.wasman.2025.114963

  21. [21] Wang, C., & Fang, J. (2023). Research on influencing factors of program management performance in construction enterprises based on fuzzy DEMATEL-ISM. In ICCREM (pp. 830–841). ASCE. https://doi.org/10.1061/9780784485217.081

  22. [22] Chalekaee, A., Turskis, Z., Khanzadi, M., Ghodrati Amiri, G., & Keršulienė, V. (2019). A new hybrid MCDM model with grey numbers for the construction delay change response problem. Sustainability, 11(3), 1–16. https://doi.org/10.3390/su11030776

  23. [23] Chamani, S., Razi, A., & Xodabande, I. (2023). Motivational and emotional states in self-directed language learning: A longitudinal study. Discover education, 2(1), 23. https://doi.org/10.1007/s44217-023-00048-9

  24. [24] Qin, Z., Li, M., Flohn, J., & Hu, Y. (2021). Thermal management materials for energy-efficient and sustainable future buildings. Chemical communications, 57(92), 12236–12253. http://dx.doi.org/10.1039/D1CC05486D

Published

2025-06-05

How to Cite

Masoomi, H., & Masoomi, H. (2025). Success Factor Prioritisation for Industrial Construction Projects in Iran: A Fuzzy DEMATEL-ANP Analysis of MAPNA Company. International Journal of Researches on Civil Engineering With Artificial Intelligence , 2(2), 92-105. https://doi.org/10.48314/ijrceai.v2i2.46

Similar Articles

1-10 of 22

You may also start an advanced similarity search for this article.