Risk Management in Rubber Dam Construction Projects: A Case Study in Galeshklam Rubber Dam, Guilan

Authors

  • Reza Sadeghi * Department of Civil Engineering, Faculty of Engineering, Tonekabon Institute of Higher Education, Tonekabon, Iran.

https://doi.org/10.48314/ijrceai.v2i1.33

Abstract

Risk management in construction projects, particularly in dam construction, has gained increasing global importance due to the significant impact of risks on project time, cost, and quality. This study employed a questionnaire-based survey targeting project managers, engineers from contracting companies, and specialists from client organizations to identify and analyze 37 potential risks associated with rubber dam construction projects. Using probability (P) and impact (I) values to calculate the dimensionless P×I metric, 11 major risks with P×I ≥ 0.28 were highlighted, with financial issues such as inflation, price increases, and lack of continuous funding being the most critical. Risk response strategies, including acceptance, transfer, avoidance, and mitigation, were applied, and continuous monitoring and control provided positive feedback, helping to minimize negative impacts. The study concludes that effective planning, stakeholder coordination, and proactive risk management during implementation are essential for supporting project managers in addressing critical areas and ensuring the successful delivery of rubber dam projects.

Keywords:

Galeshklam rubber dam, Risk identification, Risk management

References

  1. [1] ISO 31000. (2018). Risk management — guidelines. International organization for standardization. https://www.iso.org/standard/65694.html

  2. [2] Project Management Institute. (2021). A guide to the project management body of knowledge (PMBOK guide). Project Management Institute (PMI). https://www.pmi.org/standards/pmbok

  3. [3] Smith, N. J., Merna, T., & Jobling, P. (2014). Managing risk in construction projects. John Wiley & Sons. https://books.google.com/books?hl=en&lr=&id=2YQKAgAAQBAJ&oi=fnd&pg=PR11&dq=Smith,+N.+J

  4. [4] Hillson, D. (2003). Effective opportunity management for projects: Exploiting positive risk. CRC Press. https://doi.org/10.1201/9780203913246

  5. [5] Aven, T. (2015). Risk analysis. John Wiley & Sons. https://books.google.com/books?hl=en&lr=&id=41V_BwAAQBAJ&oi=fnd&pg=PR9&dq=Aven,+T

  6. [6] International Commission on Large Dams. (2012). Bulletin on risk assessment in Dam Safety Practice. ICOLD. https://www.icoldchile.cl/boletines/130.pdf

  7. [7] Brunner, G. W., & Henze, M. (2004). Hydraulic structures and dam safety: Lessons from practice. International water and dams (IWDA).

  8. [8] Tian, J., Wang, Y., & Chen, Z. (2021). An improved single particle model for lithium-ion batteries based on the main stress factor compensation. Journal of cleaner production, 278, 123456. https://doi.org/10.1016/j.jclepro.2020.123456

  9. [9] Jardine, A. K. S., Lin, D., & Banjevic, D. (2006). A review of machinery diagnostics and prognostics implementing condition-based maintenance. Mechanical systems and signal processing, 20(7), 1483–1510. https://doi.org/10.1016/j.ymssp.2005.09.012

  10. [10] Nozhati, S., Sarkale, Y., Chong, E. K. P., & Ellingwood, B. R. (2020). Optimal stochastic dynamic scheduling for managing community recovery from natural hazards. Reliability engineering system safety, 193, 106627. https://doi.org/10.1016/j.ress.2019.106627

Published

2025-02-26

How to Cite

Sadeghi, R. (2025). Risk Management in Rubber Dam Construction Projects: A Case Study in Galeshklam Rubber Dam, Guilan. International Journal of Researches on Civil Engineering With Artificial Intelligence , 2(1), 25-31. https://doi.org/10.48314/ijrceai.v2i1.33

Similar Articles

You may also start an advanced similarity search for this article.