Identification and Evaluation of Delays in Construction Projects Case Study: Quay Construction Projects in Southern Iran

Authors

https://doi.org/10.48314/ijrceai.v2i4.66

Abstract

Delays in quay construction projects can have significant consequences for project duration, cost, quality, and overall project performance. Therefore, identifying and evaluating the factors contributing to delays plays an important role in improving project management and mitigating their adverse consequences. The present study was conducted with the aim of identifying and evaluating the factors affecting delays in quay construction projects in southern Iran. In terms of its objective, this study is developmental-applied, while methodologically it employs a combination of qualitative and quantitative approaches. In the qualitative phase, the factors and components affecting project delays were identified through library research and in-depth, semi-structured interviews with experts using thematic analysis, and the conceptual model of the study was developed. In the quantitative phase, the proposed model was evaluated and tested using questionnaire data collected from 217 managers and employees involved in quay construction projects in southern Iran through Confirmatory Factor Analysis (CFA) and Structural Equation Modeling (SEM). The findings of the qualitative phase indicated that the factors affecting delays in quay construction projects in southern Iran can be classified into six main factors: contextual factors, organizational strategies, organizational factors, marketing factors, structural factors, and environmental factors, comprising a total of 31 components. The results of the quantitative phase also showed that all six factors have a direct and significant effect on delays in quay construction projects. Furthermore, the results of the validity and model-fit indices indicated adequate sample size, appropriate construct validity, and an acceptable fit of the proposed conceptual model. Based on the findings, simultaneous consideration of organizational, structural, environmental, contextual, marketing, and organizational strategic factors can contribute to the timely identification of delay risks and improve time management in quay construction projects.   

Keywords:

Project delay, Project risk management, Quay construction projects, Factors affecting delay, Thematic analysis, Structural equation modeling

References

  1. [1] Hoyt, R. E., & Liebenberg, A. P. (2011). The value of enterprise risk management. Journal of risk and insurance, 78(4), 795–822. https://doi.org/10.1111/j.1539-6975.2011.01413.x

  2. [2] Ullah, S., Wang, Z., Stokes, P., & Xiao, W. (2019). Risk perceptions and risk management approaches of Chinese overseas investors: An empirical investigation. Research in international business and finance, 47, 470–486. https://doi.org/10.1016/j.ribaf.2018.09.008

  3. [3] Bajjou, M. S., & Chafi, A. (2020). Empirical study of schedule delay in Moroccan construction projects. International journal of construction management, 20(7), 783–800. https://doi.org/10.1080/15623599.2018.1484859

  4. [4] Sanni-Anibire, M. O., Mohamad Zin, R., & Olatunji, S. O. (2022). Causes of delay in the global construction industry: A meta analytical review. International journal of construction management, 22(8), 1395–1407. https://doi.org/10.1080/15623599.2020.1716132

  5. [5] Yu, F., Chen, X., Cory, C. A., Yang, Z., & Hu, Y. (2021). An active construction dynamic schedule management model: Using the fuzzy earned value management and BP neural network. KSCE journal of civil engineering, 25(7), 2335–2349. https://doi.org/10.1007/s12205-021-1041-6

  6. [6] Cheong Yong, Y., & Emma Mustaffa, N. (2012). Analysis of factors critical to construction project success in Malaysia. Engineering, construction and architectural management, 19(5), 543–556. https://doi.org/10.1108/09699981211259612

  7. [7] Stingl, V., & Geraldi, J. (2017). Errors, lies and misunderstandings: Systematic review on behavioural decision making in projects. International journal of project management, 35(2), 121–135. https://doi.org/10.1016/j.ijproman.2016.10.009

  8. [8] Nguyen, N. M., Killen, C. P., Kock, A., & Gemünden, H. G. (2018). The use of effectuation in projects: The influence of business case control, portfolio monitoring intensity and project innovativeness. International journal of project management, 36(8), 1054–1067. https://doi.org/10.1016/j.ijproman.2018.08.005

  9. [9] Marnewick, A. L., & Marnewick, C. (2019). The ability of project managers to implement industry 4.0-related projects. IEEE access, 8, 314–324. https://doi.org/10.1109/ACCESS.2019.2961678

  10. [10] Wong, C. C., Mohd Rahim, F. A., Loo, S. C., Zainon, N., & Aziz, N. M. (2020). Conceptualising risk culture on enterprise risk management (ERM) implementation in construction companies. Built environment journal (BEJ), 17(1), 59–70. https://ir.uitm.edu.my/id/eprint/30046/

  11. [11] Li, Y., Lu, Y., Kwak, Y. H., & Dong, S. (2015). Developing a city-level multi-project management information system for Chinese urbanization. International journal of project management, 33(3), 510–527. https://doi.org/10.1016/j.ijproman.2014.06.011

  12. [12] Bülbül, D., Hakenes, H., & Lambert, C. (2019). What influences banks’ choice of credit risk management practices? Theory and evidence. Journal of financial stability, 40, 1–14. https://doi.org/10.1016/j.jfs.2018.11.002

  13. [13] Sfakianaki, E. (2018). Critical success factors for sustainable construction: A literature review. Management of environmental quality: An international journal, 30(1), 176–196. https://doi.org/10.1108/MEQ-02-2018-0043

  14. [14] Silvius, G. (2021). The role of the project management office in sustainable project management. Procedia computer science, 181, 1066–1076. https://doi.org/10.1016/j.procs.2021.01.302

  15. [15] Rodríguez Domínguez, L., & Noguera Gámez, L. C. (2014). Corporate reporting on risks: Evidence from Spanish companies. Revista de contabilidad, 17(2), 116–129. https://doi.org/10.1016/j.rcsar.2013.10.002

  16. [16] Dobler, M., Lajili, K., & Zéghal, D. (2011). Attributes of corporate risk disclosure: An international investigation in the manufacturing sector. Journal of international accounting research, 10(2), 1–22. https://doi.org/10.2308/jiar-10081

  17. [17] Selcuk, O., Turkoglu, H., Polat, G., & Hajdu, M. (2024). An integrative literature review on the causes of delays in construction projects: Evidence from developing countries. International journal of construction management, 24(6), 610–622. https://doi.org/10.1080/15623599.2022.2135939

  18. [18] Ates, M. N., Turkoglu, H., Damci, A., & Demirkesen, S. (2025). Strategies for delay mitigation in construction projects: A systematic review. 4th international civil engineering & architecture conference volume 1: Civil engineering. Golden Light Publishing. https://doi.org/10.31462/icearc2025_ce_mng_025

  19. [19] Kumar, M., & Kumari, S. (2025). Causes of delays in road construction projects: A systematic review. Journal of financial management of property and construction, 30(2), 256–294. https://doi.org/10.1108/JFMPC-01-2023-0004

  20. [20] Do, S. T., Nguyen, V. T., Tran, C. N. N., & Aung, Z. M. (2023). Identifying and evaluating the key claim causes leading to construction delays. International journal of construction management, 23(12), 1999–2011. https://doi.org/10.1080/15623599.2022.2030508

Published

2025-12-22

How to Cite

Mashhadian, M. (2025). Identification and Evaluation of Delays in Construction Projects Case Study: Quay Construction Projects in Southern Iran. International Journal of Researches on Civil Engineering With Artificial Intelligence , 2(4), 211-226. https://doi.org/10.48314/ijrceai.v2i4.66

Similar Articles

31-40 of 42

You may also start an advanced similarity search for this article.